So after I let them sit collecting dust for over a month hes calling my boss pissed that there not done. I guess its time to start on them. So I spent two days machining on these things making sure they are perfect. The valve job was cherry, I fly cut the cylinder bosses perfect. They were within his specs. I set the installed height for the customer and gave him spring shims because he wanted to assemble the heads. The customer wanted to check my work to make sure everything was up to his standards.
After a couple days of them sitting on the counter, all done, the customer decides to show up and was a little pissed at my boss because I didn't install new valve guides. I measured them and they were at the maximum allowed specs (still within specs) and wasn't going to change them because they are a pain in the butt to change. So today I spent 3 hours trying to change the valve guides and havent even changed one yet. I'm really considering about asking my boss if we don't do these heads anymore.
See how ugly these things are!
No comments:
Post a Comment